I-16 EBL over LUKE SWAMP BRANCH

9.8 MI S OF BROOKLET · County 031, Georgia · Built 1974 · 2 Lanes · 35,500 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
000000003100650
Year Built
1974
Length
43.9 m (144 ft)
Max Span
11 m
Width
13.6 m (44.6 ft)
Lanes
2
Daily Traffic
35,500
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$563,000
Total Project Cost
$844,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.