I-16 WBL over OGEECHEE RIVER OVERFLOW

1.9 MILES W OF MELDRIM · County 029, Georgia · Built 1966 · 2 Lanes · 22,500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000002900320
Year Built
1966
Reconstructed
2004
Length
73.2 m (240.2 ft)
Max Span
12.2 m
Width
13.8 m (45.3 ft)
Lanes
2
Daily Traffic
22,500
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$938,000
Total Project Cost
$1,407,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.