I-16 EBL over BLACK CREEK

8.1 MILES NE OF PEMBROKE · County 029, Georgia · Built 1966 · 2 Lanes · 36,600 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000002900250
Year Built
1966
Reconstructed
2004
Length
121.9 m (399.9 ft)
Max Span
12.2 m
Width
13.8 m (45.3 ft)
Lanes
2
Daily Traffic
36,600
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,563,000
Total Project Cost
$2,344,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.