J.O.BACON HIGHWAY over OGEECHEE RIVER

4.4 MILES S OF MELDRIM · County 029, Georgia · Built 1975 · 2 Lanes · 6,100 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000002900240
Year Built
1975
Length
217.9 m (714.9 ft)
Max Span
22.9 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
6,100
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,000
Total Project Cost
$3,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.