US 280 / SR 30 over BLACK CREEK
8.2 MILES NE OF PEMBROKE · County 029, Georgia · Built 1981 · 2 Lanes · 11,400 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
32.167422, -81.487731
This bridge is in worse condition than 20.5% of bridges in County 029. The average bridge in Georgia is 0 years old; this one is 45 years old.
Nearby Bridges
US 280 / SR 30 over BLACK CREEK OVERFLOW
Built 1981
OLIVE BRANCH ROAD over BLACK CREEK TRIB
Built 1970
US 280 / SR 30 over MILL CREEK
Built 1981
BLACK CRK CH ROAD over MILL CREEK
Built 1960
US 280 EBL / SR 30 over I-16 (SR 404)
Built 1966
US 280 WBL / SR 30 over I-16 (SR 404)
Built 1966
TONI BRANCH ROAD over CYPRUS CREEK
Built 1960
GROOVER HILL ROAD over I-16 (SR 404)
Built 1966
OLIVE BRANCH ROAD over I-16 (SR 404)
Built 1966
J.O.BACON HIGHWAY over MALDEN BRANCH
Built 1993
Bridge Details
- Structure #
- 000000002900110
- Year Built
- 1981
- Length
- 153.6 m (503.9 ft)
- Max Span
- 11 m
- Width
- 15.6 m (51.2 ft)
- Lanes
- 2
- Daily Traffic
- 11,400
- Material
- Concrete
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,969,000
- Total Project Cost
- $2,954,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.