OLD MADISON ROAD over PISCOLA CREEK

3.5 MI SE OF QUITMAN · County 027, Georgia · Built 1920 · 2 Lanes · 330 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
000000002750610
Year Built
1920
Length
80.5 m (264.1 ft)
Max Span
7.3 m
Width
6.5 m (21.3 ft)
Lanes
2
Daily Traffic
330
Material
Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,032,000
Total Project Cost
$1,547,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.