SR 76 over OKAPILCO CREEK OVERFLOW

APP 1.3 MI E OF QUITMAN · County 027, Georgia · Built 1977 · 2 Lanes · 3,530 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000002700220
Year Built
1977
Length
29.3 m (96.1 ft)
Max Span
9.8 m
Width
15.1 m (49.5 ft)
Lanes
2
Daily Traffic
3,530
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$375,000
Total Project Cost
$563,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.