US 301 /SR 23 over BUFFALO CREEK

1 MILE NORTH OF HICKOX · County 025, Georgia · Built 2006 · 2 Lanes · 3,330 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000002550360
Year Built
2006
Length
158.5 m (520 ft)
Max Span
12.2 m
Width
14.4 m (47.2 ft)
Lanes
2
Daily Traffic
3,330
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,032,000
Total Project Cost
$3,048,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.