COLEY STATION RD over SOUTH SHELLSTONE CREEK
3.5 MI NW OF COCHRAN · County 023, Georgia · Built 1974 · 2 Lanes · 680 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
32.427608, -83.389222
This bridge is in worse condition than 66.7% of bridges in County 023. The average bridge in Georgia is 0 years old; this one is 52 years old.
Nearby Bridges
US 23- SR 112 over COOLY CREEK
Built 1935
HUDSON-JONES RD over COOLY CREEK
Built 1970
US 23- US 129 ALT over BOLLINGER CREEK
Built 1935
SR 112 over BOLLINGER CREEK
Built 1999
SR87R-US23B-US129A over SOUTH SHELLSTONE CREEK
Built 1933
US 23 over SOUTH SHELLSTONE CREEK
Built 1983
PORTER ROAD over JORDAN CREEK TRIB.
Built 1973
US 23B- US 129 ALT over JORDAN CREEK TRIB.
Built 1934
MAGNOLIA ROAD over SOUTH SHELLSTONE CREEK
Built 1959
US 23- US 129 ALT over LITTLE SHELLSTONE CREEK
Built 1935
Bridge Details
- Structure #
- 000000002350070
- Year Built
- 1974
- Length
- 11.9 m (39 ft)
- Max Span
- 2.7 m
- Lanes
- 2
- Daily Traffic
- 680
- Material
- Concrete
- Design
- Culvert
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $152,000
- Total Project Cost
- $229,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.