SR 26 over GUM SWAMP CREEK

6.2 MI NE OF COCHRAN · County 023, Georgia · Built 1949 · 2 Lanes · 3,080 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000002300010
Year Built
1949
Reconstructed
1995
Length
131.7 m (432.1 ft)
Max Span
8.2 m
Width
13.2 m (43.3 ft)
Lanes
2
Daily Traffic
3,080
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,688,000
Total Project Cost
$2,532,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.