ZEBULON ROAD over I-475(SR 408) @ 9.00

4 MI W OF MACON CITY LIMI · County 021, Georgia · Built 2006 · 4 Lanes · 28,300 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000002150520
Year Built
2006
Length
105.2 m (345.1 ft)
Max Span
35.1 m
Width
29.9 m (98.1 ft)
Lanes
4
Daily Traffic
28,300
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,083,000
Total Project Cost
$3,125,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.