US 129 NBL over NS RAILROAD

2.9 MI S OF MACON CTY LMT · County 021, Georgia · Built 1953 · 2 Lanes · 20,600 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
000000002100570
Year Built
1953
Length
53 m (173.9 ft)
Max Span
17.7 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
20,600
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$680,000
Total Project Cost
$1,020,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.