SR 158 over WILLACOOCHEE RIVER

7.1 MI NE OF ALAPAHA · County 019, Georgia · Built 2021 · 2 Lanes · 460 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000001950770
Year Built
2021
Length
144.8 m (475.1 ft)
Max Span
38.1 m
Width
11.9 m (39 ft)
Lanes
2
Daily Traffic
460
Material
Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$42,180,000
Total Project Cost
$63,270,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.