CR 219 over NEW RIVER OVERFLOW

14 MI W OF NASHVILLE · County 019, Georgia · Built 1988 · 2 Lanes · 158 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
000000001950620
Year Built
1988
Length
27.4 m (89.9 ft)
Max Span
4.6 m
Width
8.1 m (26.6 ft)
Lanes
2
Daily Traffic
158
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$352,000
Total Project Cost
$527,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.