OTTER CREEK ROAD over OTTER CREEK

5 MI N OF FITZGERALD · County 017, Georgia · Built 1980 · 2 Lanes · 60 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000001750120
Year Built
1980
Length
31.1 m (102 ft)
Max Span
6.1 m
Width
9.6 m (31.5 ft)
Lanes
2
Daily Traffic
60
Material
Prestressed Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$399,000
Total Project Cost
$598,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.