US 41 SR 3 (SBL) over SR 61 (US 411)

IN NORTH CARTERSVILLE · County 015, Georgia · Built 2019 · 2 Lanes · 33,300 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000001551510
Year Built
2019
Length
70.1 m (230 ft)
Max Span
13.4 m
Width
15.8 m (51.8 ft)
Lanes
2
Daily Traffic
33,300
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$20,424,000
Total Project Cost
$30,636,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.