CONNESENA ROAD over CONNESENA CREEK

3.1 MI N OF KINGSTON · County 015, Georgia · Built 1935 · 2 Lanes · 450 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
000000001550170
Year Built
1935
Reconstructed
1950
Length
11 m (36.1 ft)
Max Span
11 m
Width
6.7 m (22 ft)
Lanes
2
Daily Traffic
450
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$141,000
Total Project Cost
$211,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.