I-75 (NBL) over M-914

2.7 MI E OF CARTERSVILLE · County 015, Georgia · Built 1977 · 3 Lanes · 99,600 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
000000001500830
Year Built
1977
Length
48.2 m (158.1 ft)
Max Span
21.3 m
Width
19 m (62.3 ft)
Lanes
3
Daily Traffic
99,600
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$786,000
Total Project Cost
$1,179,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.