I-75 (SBL) over CR645-CR397-ALLATOONA LK

3.6 MI SE OF EMERSON · County 015, Georgia · Built 1977 · 3 Lanes · 47,700 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000001500780
Year Built
1977
Length
386.2 m (1267.1 ft)
Max Span
57.9 m
Width
19 m (62.3 ft)
Lanes
3
Daily Traffic
47,700
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$6,301,000
Total Project Cost
$9,451,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.