SR 316 over SR00053

5M SOUTHEAST OF WINDER · County 013, Georgia · Built 2023 · 4 Lanes · 30,200 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000001350640
Year Built
2023
Length
45.4 m (149 ft)
Max Span
45.4 m
Width
39.5 m (129.6 ft)
Lanes
4
Daily Traffic
30,200
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$13,246,000
Total Project Cost
$19,896,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.