SR 81 over SR316

3.5 MILES SOUTH OF WINDER · County 013, Georgia · Built 2020 · 4 Lanes · 17,700 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000001350610
Year Built
2020
Length
72.7 m (238.5 ft)
Max Span
36.3 m
Width
23.2 m (76.1 ft)
Lanes
4
Daily Traffic
17,700
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$21,238,000
Total Project Cost
$31,857,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.