SR 98 over HICKORY LEVEL CREEK

3.5 MI SW OF HOMER · County 011, Georgia · Built 2017 · 2 Lanes · 1,780 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000001150720
Year Built
2017
Length
42.7 m (140.1 ft)
Max Span
42.7 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
1,780
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$12,432,000
Total Project Cost
$18,648,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.