WHEELER STREET over NORFOLK SOU. RAILROAD
IN ALTO · County 011, Georgia · Built 1980 · 1 Lanes · 1,542 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
34.470369, -83.568983
This bridge is in worse condition than 83.9% of bridges in County 011. The average bridge in Georgia is 0 years old; this one is 46 years old.
Nearby Bridges
BC GRANT ROAD over LITTLE MUD CREEK
Built 1970
CR 432 (SBL) over CR 642
Built 1967
CR 432 over NS RAILROAD
Built 1941
INDUSTRIAL PARK RO over LITTLE MUD CREEK
Built 2010
CR 642 over CR432 NS RAILROAD
Built 1967
WILBANKS ROAD over LITTLE MUD CREEK
Built 2000
CREASY PATCH ROAD over LITTLE MUD CREEK
Built 2005
CHARLIE DAVIS RD over LITTLE MUD CREEK
Built 1977
ALTO MUD CRK RD over LITTLE MUD CREEK
Built 1961
DUNCAN BRIDGE RD over LITTLE MUD CREEK
Built 1959
Bridge Details
- Structure #
- 000000001150260
- Year Built
- 1980
- Length
- 38.4 m (126 ft)
- Max Span
- 12.8 m
- Width
- 4.9 m (16.1 ft)
- Lanes
- 1
- Daily Traffic
- 1,542
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- Railroad
- Last Inspected
- N/A
- Est. Improvement
- $204,000
- Total Project Cost
- $392,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.