I-85 (SBL) over SR 164

5 MI SE OF HOMER · County 011, Georgia · Built 1963 · 2 Lanes · 53,800 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
000000001100320
Year Built
1963
Reconstructed
1981
Length
46 m (150.9 ft)
Max Span
18.6 m
Width
13.7 m (44.9 ft)
Lanes
2
Daily Traffic
53,800
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$590,000
Total Project Cost
$885,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.