SR 22 over TATTNALL STREET

0.6 MI W OF MILLEDGEVILLE · County 009, Georgia · Built 2008 · 4 Lanes · 5,790 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
000000000950420
Year Built
2008
Length
36.6 m (120.1 ft)
Max Span
17.1 m
Width
22.7 m (74.5 ft)
Lanes
4
Daily Traffic
5,790
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$725,000
Total Project Cost
$1,087,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.