FAS 2573 over HURRICANE CREEK

8 MI SE OF ALMA · County 005, Georgia · Built 1968 · 2 Lanes · 530 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000500230
Year Built
1968
Length
104.2 m (341.9 ft)
Max Span
11.6 m
Width
9.2 m (30.2 ft)
Lanes
2
Daily Traffic
530
Material
Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,336,000
Total Project Cost
$2,004,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.