COLUMBUS FORD RD over SWEETWATER CREEK
APP 3 MI N OF PEARSON · County 003, Georgia · Built 2009 · 2 Lanes · 510 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
31.337281, -82.835931
This bridge is in worse condition than 50.8% of bridges in County 003. The average bridge in Georgia is 0 years old; this one is 17 years old.
Nearby Bridges
US 221-US 441 / SR over SWEETWATER CREEK
Built 1936
US 221-US 441 / SR over SWEETWATER CREEK TRIB
Built 1989
US 221-US441 / SR3 over PUDDING CREEK
Built 1990
RICKETSON ROAD over PUDDING CREEK
Built 1990
OLD DOUGLAS RD over PUDDING CREEK
Built 1956
US 221-US441 / SR3 over SATILLA RIVER TRIB
Built 1936
SR 64 over SATILLA RIVER
Built 2022
SUNNYSIDE CH RD over MILL CREEK
Built 1980
SR 64 over SATILLA RIVER TRIB
Built 1960
US441-US221-SR64-S over LITTLE RED BLUFF CRK O/F
Built 2009
Bridge Details
- Structure #
- 000000000350370
- Year Built
- 2009
- Length
- 18.3 m (60 ft)
- Max Span
- 6.1 m
- Width
- 8.2 m (26.9 ft)
- Lanes
- 2
- Daily Traffic
- 510
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $234,000
- Total Project Cost
- $352,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.