SR 4 (US 1) over ALTAMAHA RIVER

10 MI N OF BAXLEY · County 001, Georgia · Built 2017 · 2 Lanes · 5,460 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000150560
Year Built
2017
Length
1243.6 m (4080.1 ft)
Max Span
42.7 m
Width
13.2 m (43.3 ft)
Lanes
2
Daily Traffic
5,460
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$362,304,000
Total Project Cost
$543,456,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.