US 341 WBL over NS RAILROAD

2 MILES EAST OF SURRENCY · County 001, Georgia · Built 2006 · 2 Lanes · 2,320 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000000150380
Year Built
2006
Length
61 m (200.1 ft)
Max Span
21 m
Width
12.4 m (40.7 ft)
Lanes
2
Daily Traffic
2,320
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$781,000
Total Project Cost
$1,172,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.