SELVITZ ROAD over CANAL C-104
0.5MI S of CR-712 · County 111, Florida · Built 1988 · 2 Lanes · 600 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
27.366958, -80.36485
This bridge is in worse condition than 20% of bridges in County 111. The average bridge in Florida is 0 years old; this one is 38 years old.
Nearby Bridges
DUNN ROAD over C-104 CANAL
Built 1988
PEACHTREE BLVD. over C-104 CANAL
Built 1988
CR 712 150.3 over SR 91 TPK
Built 1957
CR 712 (Midway Rd) over North Fork St Lucie Rvr
Built 2019
SR-91 NB TPK 150.7 over CR709 GLADES RD & FEC RR
Built 1959
SR91 TPK SB 150.7 over CR709 GLADES RD & FEC RR
Built 1956
SR91 N/S TPK 148.2 over Drainage Canal
Built 1956
SELVITZ RD. over CANAL C-108
Built 1985
JORGENSEN RD over CANAL C-108
Built 1985
NORTH MACEDO BLVD over CANAL C-108
Built 1985
Bridge Details
- Structure #
- 945271
- Year Built
- 1988
- Length
- 27.4 m (89.9 ft)
- Max Span
- 9.1 m
- Width
- 12.2 m (40 ft)
- Lanes
- 2
- Daily Traffic
- 600
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.