Lake Ida Road over C-3 Canal
1Mi E of CR809/Military T · County 099, Florida · Built 2002 · 4 Lanes · 30,000 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
26.473072, -80.1061
This bridge is in worse condition than 12% of bridges in County 099. The average bridge in Florida is 0 years old; this one is 24 years old.
Nearby Bridges
CONGRESS AVE SB over LWDD LATERAL 32 CANAL
Built 1988
CONGRESS AVE NB over LWDD LATERAL 32 CANAL
Built 1988
BARWICK RD over LWDD LAT 30 CANAL
Built 1964
SB I-95 (SR 9) over Lake Ida Road
Built 2004
I 95 SR 9 SB over Depot Ave & El Rio Canal
Built 2004
NB I-95 (SR 9) over Lake Ida Road
Built 2004
I 95 SR 9 NB over Depot Ave & El Rio Canal
Built 2004
LAKE IDA ROAD over CANAL E-4
Built 1996
SR806 Atlantic Ave over El Rio Canal E-4
Built 1966
CONGRESS AVE SB over LWDD LATERAL 30 CANAL
Built 1988
Bridge Details
- Structure #
- 934963
- Year Built
- 2002
- Length
- 11.1 m (36.4 ft)
- Max Span
- 11.1 m
- Width
- 28 m (91.9 ft)
- Lanes
- 4
- Daily Traffic
- 30,000
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.