CONGRESS AVE NB over LWDD LATERAL 30 CANAL
0.8 MI N OF LAKE IDA ROAD · County 099, Florida · Built 1988 · 3 Lanes · 15,250 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
26.483756, -80.089744
This bridge is in worse condition than 12% of bridges in County 099. The average bridge in Florida is 0 years old; this one is 38 years old.
Nearby Bridges
CONGRESS AVE SB over LWDD LATERAL 30 CANAL
Built 1988
I 95 SR 9 over Lateral Canal 30
Built 1998
S. LAKE DRIVE over CANAL N. END LAKE IDA
Built 1955
SB I-95 (SR 9) over Lake Ida Road
Built 2004
NB I-95 (SR 9) over Lake Ida Road
Built 2004
LAKE IDA ROAD over CANAL E-4
Built 1996
I 95 SR 9 NB over Depot Ave & El Rio Canal
Built 2004
I 95 SR 9 SB over Depot Ave & El Rio Canal
Built 2004
MISSION HILL ROAD over CANAL E-4
Built 1958
CONGRESS AVE NB over LWDD LATERAL 32 CANAL
Built 1988
Bridge Details
- Structure #
- 934930
- Year Built
- 1988
- Length
- 36.6 m (120.1 ft)
- Max Span
- 12.2 m
- Width
- 16.9 m (55.4 ft)
- Lanes
- 3
- Daily Traffic
- 15,250
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.