Woolbright Road EB over QUAIL COVEY ROAD

0.73MI W OF CONGRESS AVE. · County 099, Florida · Built 1991 · 2 Lanes · 13,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
934468
Year Built
1991
Length
17.7 m (58.1 ft)
Max Span
17.7 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
13,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.