Melaleuca Lane over E3-canal

1.1Mi W of Miltiary Trail · County 099, Florida · Built 2006 · 4 Lanes · 17,300 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
8
Very Good

Bridge Details

Structure #
934361
Year Built
2006
Length
11.6 m (38.1 ft)
Max Span
11.6 m
Width
25.4 m (83.3 ft)
Lanes
4
Daily Traffic
17,300
Material
Prestressed Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.