NB I-95 to PBIA R over I-95 Rmp A C D G & CSXRR
PBIA/I-95 Interchange · County 099, Florida · Built 2004 · 1 Lanes · 4,300 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
26.689514, -80.067917
This bridge is in worse condition than 12% of bridges in County 099. The average bridge in Florida is 0 years old; this one is 22 years old.
Nearby Bridges
SB I 95 SR 9 over Belvedere Road
Built 2004
SB I-95 to PBIA over Ramps A&G/BelvedereRd/RR
Built 2004
NB I 95 SR 9 over Belvedere Road
Built 2004
PBIA to SB I-95 over Ramps A G & C.S.X. RR
Built 2004
PBIA Rp to NB I-95 over I-95 Ramps & CSXRR
Built 2004
MERCER AVE over WEST PALM BEACH CANAL
Built 1952
BELVEDERE RD over WPB STUB CANAL
Built 1974
SB I 95 Off Ramp over Mercer Ave and CSX RR
Built 2004
I 95 SR 9 SB over Mercer Ave and CSX RR
Built 2004
I 95 SR 9 NB over Mercer Ave and CSX RR
Built 2004
Bridge Details
- Structure #
- 930482
- Year Built
- 2004
- Length
- 896.5 m (2941.3 ft)
- Max Span
- 62.6 m
- Width
- 9.4 m (30.8 ft)
- Lanes
- 1
- Daily Traffic
- 4,300
- Material
- Prestressed Concrete Continuous
- Design
- Segmental Box Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.