EB Blue Heron Blvd over C-17 Canal

1 mile East of I-95 · County 099, Florida · Built 1997 · 3 Lanes · 20,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
930468
Year Built
1997
Length
50 m (164 ft)
Max Span
11 m
Width
14.9 m (48.9 ft)
Lanes
3
Daily Traffic
20,500
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.