US-27 (SR-25) over BOLLES CANAL (L-21)

3.8 miles south of SR80 E · County 099, Florida · Built 1989 · 8 Lanes · 9,300 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
930342
Year Built
1989
Reconstructed
2024
Length
22.9 m (75.1 ft)
Max Span
8.8 m
Width
52.3 m (171.6 ft)
Lanes
8
Daily Traffic
9,300
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.