SR-808 (Glades Rd) over El Rio Canal E-4
1.4 miles East of I-95 · County 099, Florida · Built 1978 · 8 Lanes · 25,000 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
26.362233, -80.097017
This bridge is in worse condition than 78.6% of bridges in County 099. The average bridge in Florida is 0 years old; this one is 48 years old.
Nearby Bridges
NW 7TH STREET over EL RIO CANAL
Built 1991
NW 20TH ST WB over LWDD E-4 (El Rio) Canal
Built 1962
NW 20TH ST. EB over LWDD E-4 (EL RIO) CANAL
Built 1964
PALMETTO PK RD over El RIO CANAL (E-4)
Built 2023
NW 13 ST over LWDD E 3-1/2 CANAL
Built 1974
CAMINO REAL over EL RIO CANAL
Built 1995
EB SR808 Glades Rd over I 95 SR 9
Built 1974
WB SR808 Glades Rd over I 95 SR 9
Built 1974
CAMINO GARDENS WB over EL RIO CANAL
Built 1962
CAMINO GARDENS EB over EL RIO CANAL
Built 1962
Bridge Details
- Structure #
- 930319
- Year Built
- 1978
- Reconstructed
- 2000
- Length
- 38.1 m (125 ft)
- Max Span
- 8.4 m
- Width
- 38.7 m (127 ft)
- Lanes
- 8
- Daily Traffic
- 25,000
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.