US-192 EB over Canal

US-192 EB - C-57 Canal · County 097, Florida · Built 2006 · 2 Lanes · 4,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
920148
Year Built
2006
Length
45 m (147.6 ft)
Max Span
8.8 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
4,500
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.