SR-91 NB TPK 220.9 over Outfall Canal
12.4 mi. N of CR-523 · County 097, Florida · Built 1964 · 2 Lanes · 18,000 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
28.008497, -81.159083
This bridge is in worse condition than 72.3% of bridges in County 097. The average bridge in Florida is 0 years old; this one is 62 years old.
Nearby Bridges
SR-91 SB TPK 220.9 over Outfall Canal
Built 1964
CR-523 over Tpk Drainage Ditch South
Built 1968
CR-523 over Scrub Slough
Built 1968
CR-523 over Halfway Cypress
Built 1968
SR91 N/S TPK 223.7 over OUTFALL CANAL
Built 1963
CR-523 over Washout
Built 1968
SR 91 TPK NS 217 over OUTFALL CANAL
Built 1963
SR 91 TPK 225.5 over OUTFALL CANAL
Built 1964
CR-523 over Tpk Drainage Ditch North
Built 1968
SR 91 TPK NS 214.1 over OUTFALL CANAL
Built 1963
Bridge Details
- Structure #
- 920128
- Year Built
- 1964
- Reconstructed
- 1998
- Length
- 32 m (105 ft)
- Max Span
- 10.7 m
- Width
- 13.1 m (43 ft)
- Lanes
- 2
- Daily Traffic
- 18,000
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- State Toll Authority
- Last Inspected
- N/A
- Est. Improvement
- $500,000
- Total Project Cost
- $500,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.