SR 91 TPK NB 198.9 over OUTFALL CANAL

5.8 MILES N OF SR 60 · County 097, Florida · Built 1963 · 2 Lanes · 18,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
920126
Year Built
1963
Reconstructed
1998
Length
37.8 m (124 ft)
Max Span
9.4 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
18,000
Material
Prestressed Concrete
Design
Slab
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$500,000
Total Project Cost
$500,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.