US-192 over Canal

.5 Miles E. of US-17-92 · County 097, Florida · Built 1966 · 7 Lanes · 46,500 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
920031
Year Built
1966
Reconstructed
1988
Length
10.4 m (34.1 ft)
Max Span
2.4 m
Lanes
7
Daily Traffic
46,500
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.