SW 67TH DRIVE over L-62 CANAL

0.6 MI SOUTH OF SR-70 · County 093, Florida · Built 1969 · 2 Lanes · 1,200 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
914024
Year Built
1969
Reconstructed
2001
Length
31.8 m (104.3 ft)
Max Span
10.8 m
Width
8.3 m (27.2 ft)
Lanes
2
Daily Traffic
1,200
Material
Prestressed Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.