34th Avenue over Main Relief Canal

0.3 Miles North of SR 60 · County 061, Florida · Built 2017 · 2 Lanes · 4,000 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
885813
Year Built
2017
Length
32 m (105 ft)
Max Span
13.7 m
Width
14.7 m (48.2 ft)
Lanes
2
Daily Traffic
4,000
Material
Prestressed Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.