SR 9 (I-95) over CR 512 (Fellsmere Rd.)

9 miles N of SR-60 · County 061, Florida · Built 2016 · 6 Lanes · 54,314 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
880105
Year Built
2016
Length
58.6 m (192.3 ft)
Max Span
29.3 m
Width
36.9 m (121.1 ft)
Lanes
6
Daily Traffic
54,314
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.