SR 9 (I-95) over 4th St. and Canal D

2.0 mi S of SR-60 · County 061, Florida · Built 2014 · 6 Lanes · 56,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
880100
Year Built
2014
Length
78.9 m (258.9 ft)
Max Span
33.7 m
Width
36.9 m (121.1 ft)
Lanes
6
Daily Traffic
56,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.