SR-60 over ICWW

0.6 mi W of SR-A1A · County 061, Florida · Built 1995 · 4 Lanes · 20,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
880087
Year Built
1995
Length
1168.6 m (3834 ft)
Max Span
43.3 m
Width
30.2 m (99.1 ft)
Lanes
4
Daily Traffic
20,500
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.