SR91 NB TPK 175.4 over OUTFALL CANAL

9.3 mi S of Ft Drum Plz · County 061, Florida · Built 1963 · 2 Lanes · 18,350 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
880065
Year Built
1963
Length
43.2 m (141.7 ft)
Max Span
8.6 m
Width
12.1 m (39.7 ft)
Lanes
2
Daily Traffic
18,350
Material
Prestressed Concrete
Design
Slab
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.