NE 88th Street over Tidal Canal

0.5 miles W of A1A · County 086, Florida · Built 1989 · 2 Lanes · 447 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
878001
Year Built
1989
Length
21.6 m (70.9 ft)
Max Span
8.4 m
Width
11.4 m (37.4 ft)
Lanes
2
Daily Traffic
447
Material
Concrete Continuous
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.