Lugo Avenue over Coral Bay
0.4 Mi. E of Ingraham Hwy · County 086, Florida · Built 1940 · 2 Lanes · 3,825 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
25.652653, -80.278258
This bridge is in worse condition than 70% of bridges in County 086. The average bridge in Florida is 0 years old; this one is 86 years old.
Nearby Bridges
Old Cutler Road over Snapper Creek Canal
Built 1956
SW 124th Street over Canal C-100-A
Built 1965
SW 136th Street over Canal C-100-A
Built 1966
Matheson Hmk Road over Matheson Hammock Canal
Built 1967
SW 144th Street over Canal C-100-A
Built 1965
SW 57th Avenue over Snapper Creek Canal
Built 1959
SW 77th Avenue over Canal C-100-A
Built 1966
SW 72nd Avenue over Swamp Area (Gully)
Built 1920
SW 144th Street over Canal C-100-C
Built 1963
SW 152nd Street over Canal 100-A
Built 1966
Bridge Details
- Structure #
- 875308
- Year Built
- 1940
- Length
- 18.3 m (60 ft)
- Max Span
- 6.2 m
- Width
- 9.6 m (31.5 ft)
- Lanes
- 2
- Daily Traffic
- 3,825
- Material
- Concrete
- Design
- Tee Beam
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $715,000
- Total Project Cost
- $715,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.